Min order:1
Payment: TT
Shipping Port: Guangzhou
Original Region:Guangzhou China
Lead Time:22 days after receiving deposit
This equipment is an automatic case packer to sort the incoming products into the carton through the parallel delta robot according to the set arrangement. It can be used with carton erector and carton sealing machine.
Product show
Product parameter
Specification
1. The main function of this equipment is to put incoming products into the carton according to the set arrangement.
2. The main body of this product is made of stainless steel and up to food grade standard.
3. The delta robots is used as the packing actuator with high repetition precision and high working efficiency.
4. PLC servo motor control, to achieve accurate positioning + accurate grabbing.
5. The suction cup and gripper can be replaced according to different products.
6. The picking speed of 30~60 times/minute (according to the weight of the object), high production efficiency
7. After installation and debugging only need one button control to start and stop.
8. Fast disassembly structure design for switching to different tooling.
9. Customization for different electrical safety regulations such as CSA (Canadian Standards Association), Nemko or other standards, and must undergo strict inspection and testing before delivery.
1.Maximum Pick-up Height:the maximum descending distance from the center of the origin position verticaldownward during the pickup process。2.Rated Load:the maximum load of the robot under the best performance and normal operation of the robot3.Max Load:the maximum load of the robot which is exceeding the rated load. If it go beyond the rated load,the robot performance index will be affected, the wear problem of the motor, wearing parts, driven arm,intermediate shaft will be much more seriously Min order:1 Payment:T/T ShippingPort:GUANGZHOU Original Region:CHINA Lead Time:15 days after receiving deposit
Read More1.Maximum Pick-up Height:the maximum descending distance from the center of the origin position vertical downward during the pickup process。2.Rated Load:the maximum load of the robot under the best performance and normal operation of the robot3.Max Load:the maximum load of the robot which is exceeding the rated load. If it go beyond the rated load, the robot performance index will be affected, the wear problem of the motor, wearing parts, driven arm, intermediate shaft will be much more seriously Min order:1 Payment:T/T ShippingPort:GUANGZHOU Original Region:CHINA Lead Time:15 days after receiving deposit
Read More1.Maximum Pick-up Height:the maximum descending distance from the center of the origin position verticaldownward during the pickup process。2.Rated Load:the maximum load of the robot under the best performance and normal operation of the robot3.Max Load:the maximum load of the robot which is exceeding the rated load. If it go beyond the rated load,the robot performance index will be affected, the wear problem of the motor, wearing parts, driven arm,intermediate shaft will be much more seriously Min order:1 Payment:T/T ShippingPort:GUANGZHOU Original Region:CHINA Lead Time:15 days after receiving deposit
Read More1.Maximum Pick-up Height:the maximum descending distance from the center of the origin position verticaldownward during the pickup process。2.Rated Load:the maximum load of the robot under the best performance and normal operation of the robot3.Max Load:the maximum load of the robot which is exceeding the rated load. If it go beyond the rated load,the robot performance index will be affected, the wear problem of the motor, wearing parts, driven arm,intermediate shaft will be much more seriously Min order:1 Payment:T/T ShippingPort:GUANGZHOU Original Region:CHINA Lead Time:15 days after receiving deposit
Read More1.Maximum Pick-up Height:the maximum descending distance from the center of the origin position verticaldownward during the pickup process。2.Rated Load:the maximum load of the robot under the best performance and normal operation of the robot3.Max Load:the maximum load of the robot which is exceeding the rated load. If it go beyond the rated load,the robot performance index will be affected, the wear problem of the motor, wearing parts, driven arm,intermediate shaft will be much more seriously Min order:1 Payment:T/T ShippingPort:GUANGZHOU Original Region:CHINA Lead Time:15 days after receiving deposit
Read More1.Maximum Pick-up Height:the maximum descending distance from the center of the origin position verticaldownward during the pickup process。2.Rated Load:the maximum load of the robot under the best performance and normal operation of the robot3.Max Load:the maximum load of the robot which is exceeding the rated load. If it go beyond the rated load,the robot performance index will be affected, the wear problem of the motor, wearing parts, driven arm,intermediate shaft will be much more seriously Min order:1 Payment:T/T ShippingPort:GUANGZHOU Original Region:CHINA Lead Time:15 days after receiving deposit
Read More1.Maximum Pick-up Height:the maximum descending distance from the center of the origin position verticaldownward during the pickup process。2.Rated Load:the maximum load of the robot under the best performance and normal operation of the robot3.Max Load:the maximum load of the robot which is exceeding the rated load. If it go beyond the rated load,the robot performance index will be affected, the wear problem of the motor, wearing parts, driven arm,intermediate shaft will be much more seriously Min order:1 Payment:T/T ShippingPort:GUANGZHOU Original Region:CHINA Lead Time:15 days after receiving deposit
Read More1.Maximum Pick-up Height:the maximum descending distance from the center of the origin position verticaldownward during the pickup process。2.Rated Load:the maximum load of the robot under the best performance and normal operation of the robot3.Max Load:the maximum load of the robot which is exceeding the rated load. If it go beyond the rated load,the robot performance index will be affected, the wear problem of the motor, wearing parts, driven arm,intermediate shaft will be much more seriously Min order:1 Payment:T/T ShippingPort:GUANGZHOU Original Region:CHINA Lead Time:15 days after receiving deposit
Read More